Archive ouverte

Delesmont, Régis | Dewarumez, Jean-marie | Hitier, Benoist | Lefebvre, Alain | Luczak, Christophe | Woehrling, Daniel

This is the 27th annual surveillance report concerning the central nuclear power plant of Gravelines. This very high power level (5400 MW) results from six plant units located on the shore and is characterised by a cooling system with a coastal surface input and output. The production of electricity began in 1980 and reached maximum in 1986. Surveillance studies concern monitoring of fish populations (larvae and eggs of Sole and Sprat) or crustaceans( shrimps), benthic system (intertidal and subtidal) and pelagic system (hydrology, microbiology, phytoplankton, zooplankton). This survey deals with spatial and temporal approaches (i) study of the direct impact by comparison of the input and output seawater stations, (ii) study of medium and long term evolution of the area by comparison with a reference station.. Ce travail constitue le 27e rapport de surveillance du site électronucléaire de Gravelines dont la grande puissance (5400 MW) est assurée par le fonctionnement de 6 tranches. Ce site, implanté sur le littoral, présente une prise d'eau de mer assurant le refroidissement du système et un rejet côtier d'eau chaude en surface. Le fonctionnement de la centrale a débuté en 1980 et elle a atteint la puissance maximale en 1986. La surveillance concerne le milieu halieutique (larves et oeufs de Sole, de Sprat et crevettes grises), les milieux benthiques (intertidal et subtidal) et pélagique (hydrologie, microbiologie, phytoplancton, zooplancton). La stratégie de surveillance est basée sur une approche spatiale et temporelle (i) Etude de l'impact immédiat par comparaison de la station « Prise d'eau » et de la station « Canal de rejet » sur une surface limitée (ii) Etude de l'évolution à moyen ou à long terme du milieu marin par rapport à une situation de référence (échelle locale).

Suggestions

Du même auteur

Surveillance Écologique et Halieutique. Site de Gravelines. Novembre 1999 - Octobre 2000

Auteurs :

  • Le Fevre-lehoerff, Geneviève
  • Delesmont, Régis
  • Dewarumez, Jean-marie

text | 2001-03

This is the 23th annual surveillance report concerning the Gravelines nuclear power plant. Gravelines, located between Calais and Dunkerque and very high power station (5400 MW) with sixth plants. liegining of electricity producti...

Surveillance Écologique et Halieutique. Site de Gravelines. Novembre 2000 - Octobre 2001

Auteurs :

  • Delesmont, Régis
  • Dewarumez, Jean-marie
  • Hitier, Benoist

text | 2002-03

This is the 24th annual surveillance report concerning the central nuclear power plant of Gravelines. This very high power level (5400 MW) results from six plant units located on the shore and is characterised by a cooling system ...

Surveillance Écologique et Halieutique. Site de Gravelines. Novembre 1997 - Octobre 1998

Auteurs :

  • Le Fevre - Lehoerff, Geneviève
  • Delesmont, Régis
  • Dewarumez, Jean-marie

text | 1999-04

La stratégie de surveillance est identique à celle des années précédentes. Durant la période 1997-1998, les températures plus élevées que la normale ont été relevées la température moyenne de l'air s'établit, pour la période, à 11...